Langley Waterproofing - second to none waterproofing

Built Up Roofing

The Need For Excellence

Kingsbury High School

When London’s largest high school approached specialist consultants Capital PCC to refurbish its facilities, Langley was called upon for the roof refurbishment element. Langley’s in-depth survey and report highlighted complications with the schools current drainage system and inefficient insulation.

Sir Stirling Moss

Langley has undertaken an impressive Copper Veral roofing project at the Mayfair home of British racing icon Sir Stirling Moss.

Cedars Upper School

When Cedars Upper School in Leighton Buzzard required a roofing solution designed and installed within strict budgets, they turned to Langley, who provide a system lifespan guarantee of at least 30 years to help reduce total life costs and provide peace of mind.

Nursery Close

Refurbishment works to both the roof and balcony walkways were undertaken at the same time by Hounslow Homes at the Nursery Close estate.

Jack Hunt Secondary School

Refurbishing a school roof during term time is always a challenge and the roof works at Jack Hunt Secondary School provided just this challenge coupled with the removal and subsequent waterproofing of several large and redundant barrel rooflights all while students studied below.

Broadwater Farm Estate

Langley has completed more than 12,500m²  of roof refurbishment works at a North London housing estate.

Bishop Bell C of E Secondary School, Eastbourne

Langley's superior product offering and expertise were chosen to refurbish the schools multiple flat roof areas after the existing asphalt roof covering had come to the end of its useful lifespan.

Belleville School Annex

Wandsworth Borough Council entrusted Langley with two bespoke challenges for the roof refurbishment works at Belleville Primary School.

Lindfield Primary School, Lindfield, West Sussex

The lead covering to this rotunda roof at Lindfield Primary School, West Sussex had been stolen, and approved contractor Breyer Group Plc turned to Langley for a new waterproofing system.

Abbey Road Estate, London

Forty years after being made famous by the Beatles the estate on Abbey Road had a face lift.

St Marys Estate, Hackney

As the preferred material supplier Langley worked in partnership with LHC to deliver Phase I of the Decent Homes programme within London Borough of Hackney.

Case Studies Directory

Build-Up Type
Project Type
Region
United Kingdom

Featured Case Studies