The rooftop walkway and patio areas of this residential block in Bedminster required stripping back to the deck and renewing, as they had started to leak into the flats below.

Langley’s TA-20 system was specified, and any possible fire risk was avoided by using SA-20 next to any potentially flammable wall cladding, in line with the NFRC’s Safe2Torch initiative. Langley Approved Contractor, Central Roofing & Building Services Ltd, carefully removed, stored and re-instated the bespoke metal capping on the parapets, and re-used the existing paving. They also worked closely with residents to enable access to their homes throughout.

An extra design feature, improving rainwater drainage with new parapet chute outlets, was expertly incorporated mid-project. The walkway and patio areas are now protected for 20 years by the Langley independent insurance-backed guarantee.

Main System Products:

Paradiene SA

Adepar JS VV

Parevapo SA

Parafoam Ultra

Paradiene [35] S R4

Parevapo SBS

Parafor 30 GS

Parafor Solo SA

Supracoating

 

Download the full Case Study

Further Information

Find out more about our roofing services by calling us on 01327 704778 or emailing us at [email protected]

Other Case Studies

22/04/2021

Netherthorpe Academy

CONTRACTOR: Everlast Waterproofing CONSULTANT: Eddisons SYSTEM USED: TA-25 Flat Roofing System Netherthorpe Academy has made best use of Condition Improvement Funding (CIF) to optimise the health and safety of an estate that combines aesthetic heritage spanning back 450... > Read more

22/04/2021

Radford Primary School

CONTRACTOR: Cambridge Flat Roofing Premier Roofing Construction CONSULTANT: Barker Associates SYSTEM USED: TA-30 Flat Roofing System Langley Structures Striptiles Water leaking into the classrooms alerted the management team at Radford Primary Academy to the need to... > Read more