Case Studies

19/06/2018

Alec Hunter Academy

Langley worked on this planned asset management roof refurbishment project, carried out in three phases, to update and give this academy a new lease of life.

A comprehensive roof condition survey identified that some roofs could be overlaid, while others had some structural issues, including two decaying Trofdeck roofs which required completely stripping back and rebuilding from joists up. Refurbishment work was carried out in phases as part of a five year asset management plan for the academy, keeping disruption to a minimum and spreading the cost.

In this third phase Langley Approved Contractor, R T Roofing Services Ltd, expertly completed eight roofs to a high standard, including new rooflights with complex detailing. The 25 year independent insurance backed guarantee provides peace of mind. Trevor Lawn, Headteacher of Alec Hunter Academy commented: “We have been delighted with the project and with the outcomes so we look forward to a leak-free future for many years to come.”

Main System Products:

Rooflight Scheme

Parevapo SBS

Parafoam Ultra

Adepar JS VV

Paradiene (35) SR4

Paratrim GRP

Parafor Solo GS

Download the full Case Study

Further Information

Find out more about our roofing services by calling us on 01327 704778 or emailing us at [email protected]

Other Case Studies

22/04/2021

Netherthorpe Academy

CONTRACTOR: Everlast Waterproofing CONSULTANT: Eddisons SYSTEM USED: TA-25 Flat Roofing System Netherthorpe Academy has made best use of Condition Improvement Funding (CIF) to optimise the health and safety of an estate that combines aesthetic heritage spanning back 450... > Read more

22/04/2021

Radford Primary School

CONTRACTOR: Cambridge Flat Roofing Premier Roofing Construction CONSULTANT: Barker Associates SYSTEM USED: TA-30 Flat Roofing System Langley Structures Striptiles Water leaking into the classrooms alerted the management team at Radford Primary Academy to the need to... > Read more