The swimming pool roof of this leisure centre had been repaired several times, and suffered from intermittent leaks.

In addition, the refurbishment of the pool area below required the installation of new air conditioning units, however the existing roof did not have the structural strength to bear their weight.

Langley designed and specified a new, high strength metal deck as the base for a comprehensive waterproofing system, to support multiple plant installations and provide a durable roofing solution.

Arc Group London Ltd, a Langley Approved Contractor, completed the project to a very high standard, carefully installing new rooflights which required expert detailing. The leisure centre now has reassurance that the design, materials and workmanship of the roof is protected for 20 years by Langley’s independent insurance backed guarantee.

Main System Products:

Parevapo SBS

Parafoam Ultra Tapered

Adepar JS VV

Parafurb Refurbishment Outlet

Paradiene (35) SR4

Paratrim GRP

Parafor Solo GS

Supracoating

Rooflight Scheme

Download the full Case Study

Further Information

Find out more about our roofing services by calling us on 01327 704778 or emailing us at [email protected]

Other Case Studies

13/05/2020

King George Hospital

Contractor:  Inspire Contracts Ltd Size:  1,300m² Aging roof estates and reduced maintenance budgets have resulted in reactive maintenance becoming the only feasible way for many trusts to operate. For this reason, roofs demand attention only when a problem... > Read more

29/04/2020

RAF Waddington

CLIENT: Amey Property Services CONTRACTOR: Morello Services Ltd SIZE: 3,200m² Having reached the end of its life expectancy, the existing roof at RAF Waddington, Lincolnshire, had begun to experience issues, including water ingress. After a roof condition survey... > Read more