Case Studies

23/07/2020

Blake House

CONTRACTOR
M.H. Goldsmith & Sons Ltd
SYSTEM USED:
CP-20 Paracoat Cold Polyurea System
SIZE:
950m²

Blake House was built in 1922, part of the William Blake estate in the London Borough of Lambeth. The property and estate take its name from the famous poet and artist who lived in the area at the end of the 18th century.

The building, in recent years, had suffered several roof leaks that had resulted in costly reactive remedial works being carried out.

Langley's CP-20 Paracoat Cold Polyurea System was the chosen specification, as a durable waterproofing solution to rectify the ageing and failing flat roof estate. 

Read more about this roof terrace application by downloading the full case study below

Further Information

Find out more about our roofing services by calling us on 01327 704778 or emailing us at [email protected]

Other Case Studies

22/04/2021

Netherthorpe Academy

CONTRACTOR: Everlast Waterproofing CONSULTANT: Eddisons SYSTEM USED: TA-25 Flat Roofing System Netherthorpe Academy has made best use of Condition Improvement Funding (CIF) to optimise the health and safety of an estate that combines aesthetic heritage spanning back 450... > Read more

22/04/2021

Radford Primary School

CONTRACTOR: Cambridge Flat Roofing Premier Roofing Construction CONSULTANT: Barker Associates SYSTEM USED: TA-30 Flat Roofing System Langley Structures Striptiles Water leaking into the classrooms alerted the management team at Radford Primary Academy to the need to... > Read more