Cedars Upper School

Cedars Upper School

When Cedars Upper School in Leighton Buzzard required a roofing solution designed and installed within strict budgets, they turned to Langley, who provide a system lifespan guarantee of at least 30 years to help reduce total life costs and provide peace of mind.

Working with the school’s chosen consultant  Wilby and Burnett, Langley’s team began by undertaking a comprehensive survey of the school’s existing roofing system. This detailed and bespoke report, including accompanying budget, not only helped to identify which areas needed attention and what solutions were most suitable, but also helped the school and Wilby and Burnett apply quickly and accurately for adequate funding.

Langley approved contractor, Acclaim Contracts, worked quickly to deliver the specified flat roofing solution – providing a high-quality finish and level of service without unnecessary disruption to school life and the students learning. The wide range of solutions offered by Langley also helped the project run smoothly, as additional products were supplied where needed in order to replace rooflights and upgrade the roof’s thermal quality in certain areas.

 

Main System Products:

Adepar JS

Parevapo SBS

Parafoam Ultra Insulation

Paradiene [35] SR4

Parafor 30 GS

Paraglaze Rooflights

 

 

Download the full Case Study

Further Information

Find out more about our roofing services by calling us on 01327 704778 or emailing us at [email protected]

Other Case Studies

07/11/2019

Amwell Court

Impact Roofing and Building Ltd in partnership with Wates Living Space, carried out refurbishment on four residential blocks in North London. A high standard of commitment and workmanship was carried out on Bransby, Chadworth, Lynton and Patten House. After an initial... > Read more

30/10/2019

Christ's Hospital School

Christ’s Hospital is a unique independent boarding school which educates a large proportion of its students for free, having been founded as a charitable school in 1552. When water began leaking through a flat roof into one of the classrooms, the school contacted... > Read more