Case Studies

27/06/2017

Durdham Court

Langley was commissioned  to assist with the asset management programme on behalf of an estate management company. Langley undertook a full roof survey and produced a free comprehensive condition report detailing existing roof build up, thermal performance, roof defects and design considerations.

After testing that the existing roof was suitable for overlaying,  Langley recommended a TA-20 warm roof system with insulation to improve the thermal efficiency ensuring that the roof, including new rooflights, achieved Part L compliance. The condition survey was supported by a bespoke specification which included detailed designs and U-Value calculations.

Central Roofing and Building Services Ltd a Langley Approved Contractor, successfully completed the project to a high standard with minimum disruption to the estate’s residents. On completion, 3Sixty Real Estate, the block management company and Durdham Court residents have complete peace of mind their roof is covered by a Langley independent insurance backed guarantee for 20 years.

 

Main System Products:

Adepar JS VV

Elastoflex GS

LangStik SF

Paradiene S VV

Paradiene [35] S R4

Parafoam Ultra

Parafor 30 GS

Rooflights

 

Download the full Case Study

Further Information

Find out more about our roofing services by calling us on 01327 704778 or emailing us at [email protected]

Other Case Studies

13/05/2020

King George Hospital

Contractor:  Inspire Contracts Ltd Size:  1,300m² Aging roof estates and reduced maintenance budgets have resulted in reactive maintenance becoming the only feasible way for many trusts to operate. For this reason, roofs demand attention only when a problem... > Read more

29/04/2020

RAF Waddington

CLIENT: Amey Property Services CONTRACTOR: Morello Services Ltd SIZE: 3,200m² Having reached the end of its life expectancy, the existing roof at RAF Waddington, Lincolnshire, had begun to experience issues, including water ingress. After a roof condition survey... > Read more