Langley was selected to carry out a full condition survey of the flat roofs by Hampshire County Council, the design consultant and project manager for this installation. The work was part of a major upgrade to the buildings across the school’s estate. The roofs were found to be dry which enabled Langley to specify an overlay of the existing roof system as a cost-effective solution, extending the lifespan of the roofs without replacing them.

Langley Approved Contractor Salnor Roofing Services Ltd carried out the work to an excellent standard, during term time. They carried out extensive preparation work, removing redundant penetrations and raising the window cill level. Internal rainwater outlets were refurbished, and a bespoke perimeter detail installed in order to accommodate the increased width of the building’s new insulated perimeter cladding.

The school now has peace of mind thanks to a 20 year independent insurance backed guarantee which includes, in this case, the underlying roof which had been thoroughly examined in the Langley survey.


Main System Products:

Rooflight Scheme

Paradiene S VV

Parafoam Ultra

Adepar JS

Paradiene [35] S R4

Elastoflex GS

Supracoating

 

Download the full Case Study

Further Information

Find out more about our roofing services by calling us on 01327 704778 or emailing us at [email protected]

Other Case Studies

24/02/2021

Alderbrook School

CONTRACTOR: Milestone Contracting Ltd CONSULTANT: Pellings LLP SYSTEM USED: TA-25 Flat Roofing System Teamwork at all levels has proved critical in overcoming unforeseen obstacles in the execution of a school roof upgrade. Richmond & Wandsworth Council... > Read more

24/02/2021

Sulivan School

CONTRACTOR: Opus Waterproofing Solutions CONSULTANT: Wilby + Burnett SYSTEM USED: TA-30 Flat Roofing System Sulivan Primary School in Fulham has a history of defying the odds, overcoming external factors including the threat of closure to continue to deliver a quality... > Read more