Langley was selected to provide a warm roof specification for the upgrading of the existing uninsulated roof to comply with current regulations.

The existing stone parapet wall to the front of the building proved challenging with custom drawings required for the flashing to prevent damage to the stonework. There was also unusual detailing on a new glazed area covering a communal walkway adjacent to the roof.

The refurbishment was completed by Langley Approved Contractor GWS Roofing & Loft Specialist Ltd to an excellent standard, on time and with multiple trades onsite all while the building was occupied. The contract was overseen and administered by CKW Surveyors Ltd, who were happy with the professional and expert service provided by GWS and Langley.

Langley was successfully chosen for our bespoke design service to accommodate detailing whilst benefiting from a 20 year insurance backed guarantee. 

 

Main System Products:

Parafor Solo GS    

Adepar JS

Parafoam Ultra Insulation

Parevapo SBS 

Paradiene [35] S R4 

 

Download the full Case Study

Further Information

Find out more about our roofing services by calling us on 01327 704778 or emailing us at [email protected]

Other Case Studies

24/02/2021

Alderbrook School

CONTRACTOR: Milestone Contracting Ltd CONSULTANT: Pellings LLP SYSTEM USED: TA-25 Flat Roofing System Teamwork at all levels has proved critical in overcoming unforeseen obstacles in the execution of a school roof upgrade. Richmond & Wandsworth Council... > Read more

24/02/2021

Sulivan School

CONTRACTOR: Opus Waterproofing Solutions CONSULTANT: Wilby + Burnett SYSTEM USED: TA-30 Flat Roofing System Sulivan Primary School in Fulham has a history of defying the odds, overcoming external factors including the threat of closure to continue to deliver a quality... > Read more