Howard Court

A Langley specification was chosen for this residential block in Cambridge as it met the design criteria while remaining cost-effective. Additional budget sensitivities needed to be considered due to the project being funded by the residents.

The existing structural deck was very fragile, being constructed of compressed stramit strawboard. Langley Approved Contractor, Acclaim Contracts Ltd, strengthened the existing deck with structural plywood.

They successfully installed a new Langley TA-20 RBM system including new access hatches and fascia without any noise or disturbance complaints from the residents. The new roofing system has an independent, insurance-backed guarantee for 15 years, providing residents with peace of mind.

Main System Products:

Paradiene S VV

Parafoam Ultra

Adepar JS VV

Paradiene [35] S R4

Elastoflex GS

Rooflight Scheme

 

Download the full Case Study

Further Information

Find out more about our roofing services by calling us on 01327 704778 or emailing us at [email protected]

Other Case Studies

13/05/2020

King George Hospital

Contractor:  Inspire Contracts Ltd Size:  1,300m² Aging roof estates and reduced maintenance budgets have resulted in reactive maintenance becoming the only feasible way for many trusts to operate. For this reason, roofs demand attention only when a problem... > Read more

29/04/2020

RAF Waddington

CLIENT: Amey Property Services CONTRACTOR: Morello Services Ltd SIZE: 3,200m² Having reached the end of its life expectancy, the existing roof at RAF Waddington, Lincolnshire, had begun to experience issues, including water ingress. After a roof condition survey... > Read more