Refurbishing a school roof during term time is always a challenge and the roof works at Jack Hunt Secondary School provided just this challenge coupled with the removal and subsequent waterproofing of several large and redundant barrel rooflights all while students studied below.

Harmony Roofing Services Ltd picked up this challenge and carried out the works using Langley’s TA-20 warm roof system, replacing many rooflights using Paraglaze barrel rooflights while the client opted for Langley’s Red Brick coloured cap sheet which is in keeping with the schools' existing flat roofing.

The resulting 1400m² completed works is a testament to the quality detailing over the many levels and obstructions presented on this project.

 

Main System Products:

Parevapo SBS

Parafoam Ultra Insulation

Adepar JS

Parafor Solo GS

 

 

Download the full Case Study

Further Information

Find out more about our roofing services by calling us on 01327 704778 or emailing us at [email protected]

Other Case Studies

13/05/2020

King George Hospital

Contractor:  Inspire Contracts Ltd Size:  1,300m² Aging roof estates and reduced maintenance budgets have resulted in reactive maintenance becoming the only feasible way for many trusts to operate. For this reason, roofs demand attention only when a problem... > Read more

29/04/2020

RAF Waddington

CLIENT: Amey Property Services CONTRACTOR: Morello Services Ltd SIZE: 3,200m² Having reached the end of its life expectancy, the existing roof at RAF Waddington, Lincolnshire, had begun to experience issues, including water ingress. After a roof condition survey... > Read more