When London’s largest high school approached specialist consultants Capita PCC to refurbish its facilities, Langley was called upon for the roof refurbishment element. Langley’s in-depth survey and report highlighted complications with the schools current drainage system and inefficient insulation.

The roof’s unusual design meant that every roof had to be individually designed due to the variation between the roofs and drainage issues each roof presented.

The resulting Langley specification overcame these variations correcting the drainage on each roof area and enabling the school to retain more heat with improved insulation throughout.

The first phase of the refurbishment, totalling 5,000m², was completed by Langley approved contractor Breyer Group PLC to an exacting high standard and within timeframes. 

 

Main System Products:

Adepar JS

Paradiene [35] S R4

Parevapo SBS

Parafor Solo GS

 

Download the full Case Study

Further Information

Find out more about our roofing services by calling us on 01327 704778 or emailing us at [email protected]

Other Case Studies

24/02/2021

Alderbrook School

CONTRACTOR: Milestone Contracting Ltd CONSULTANT: Pellings LLP SYSTEM USED: TA-25 Flat Roofing System Teamwork at all levels has proved critical in overcoming unforeseen obstacles in the execution of a school roof upgrade. Richmond & Wandsworth Council... > Read more

24/02/2021

Sulivan School

CONTRACTOR: Opus Waterproofing Solutions CONSULTANT: Wilby + Burnett SYSTEM USED: TA-30 Flat Roofing System Sulivan Primary School in Fulham has a history of defying the odds, overcoming external factors including the threat of closure to continue to deliver a quality... > Read more