When London’s largest high school approached specialist consultants Capita PCC to refurbish its facilities, Langley was called upon for the roof refurbishment element. Langley’s in-depth survey and report highlighted complications with the schools current drainage system and inefficient insulation.

The roof’s unusual design meant that every roof had to be individually designed due to the variation between the roofs and drainage issues each roof presented.

The resulting Langley specification overcame these variations correcting the drainage on each roof area and enabling the school to retain more heat with improved insulation throughout.

The first phase of the refurbishment, totalling 5,000m², was completed by Langley approved contractor Breyer Group PLC to an exacting high standard and within timeframes. 

 

Main System Products:

Adepar JS

Paradiene [35] S R4

Parevapo SBS

Parafor Solo GS

 

Download the full Case Study

Further Information

Find out more about our roofing services by calling us on 01327 704778 or emailing us at [email protected]

Other Case Studies

28/06/2019

Northampton International Academy

Langley provided an innovative and durable solution to the challenges posed by this major roof refurbishment project. The architecturally award-winning building, previously branded as an eyesore, was once a Royal Mail sorting office which lay derelict for years until its... > Read more

28/02/2019

Clitheroe Golf Club

The proximity of pitched roofs and upstands were identified as potential fire risks by Langley’s comprehensive roof condition survey, requiring a flame free system. Langley’s survey highlighted that despite a multitude of ageing roof systems which had been... > Read more