Kingsbury High School

When London’s largest high school approached specialist consultants Capita PCC to refurbish its facilities, Langley was called upon for the roof refurbishment element. Langley’s in-depth survey and report highlighted complications with the schools current drainage system and inefficient insulation.

The roof’s unusual design meant that every roof had to be individually designed due to the variation between the roofs and drainage issues each roof presented.

The resulting Langley specification overcame these variations correcting the drainage on each roof area and enabling the school to retain more heat with improved insulation throughout.

The first phase of the refurbishment, totalling 5,000m², was completed by Langley approved contractor Breyer Group PLC to an exacting high standard and within timeframes. 

 

Main System Products:

Adepar JS

Paradiene [35] S R4

Parevapo SBS

Parafor Solo GS

 

Download the full Case Study

Further Information

Find out more about our roofing services by calling us on 01327 704778 or emailing us at [email protected]

Other Case Studies

13/05/2020

King George Hospital

Contractor:  Inspire Contracts Ltd Size:  1,300m² Aging roof estates and reduced maintenance budgets have resulted in reactive maintenance becoming the only feasible way for many trusts to operate. For this reason, roofs demand attention only when a problem... > Read more

29/04/2020

RAF Waddington

CLIENT: Amey Property Services CONTRACTOR: Morello Services Ltd SIZE: 3,200m² Having reached the end of its life expectancy, the existing roof at RAF Waddington, Lincolnshire, had begun to experience issues, including water ingress. After a roof condition survey... > Read more