Case Studies

27/04/2012

London Victoria Station

London Victoria Station

The myriad of roofs above London Victoria Station required a unique approach when in recent need of refurbishment. 

The combination of flat and sloping roofs along with walkways, plant equipment and various obstructions meant Langley’s ability to seamlessly provide both high-performance bituminous felt membranes and high-quality liquid roofing fit perfectly for the client's requirements. 

Langley approved contractors, Heartfelt Roofing Limited, worked to provide an excellent finish on all areas, in particular where the two systems merge, creating a flexible, durable and long lasting solution.


Main System Products RBM:

Paradiene [35] SR4

Parafor Solo

Main System Products Liquid Roofing:

Paracoat Base Coat

Paracoat Base Coat

Langley Embedment Fleece

Paracoat Top Coat Paraquartz Top Coat (Walkways)

 

 

Download the full Case Study

Further Information

Find out more about our roofing services by calling us on 01327 704778 or emailing us at [email protected]

Other Case Studies

22/04/2021

Netherthorpe Academy

CONTRACTOR: Everlast Waterproofing CONSULTANT: Eddisons SYSTEM USED: TA-25 Flat Roofing System Netherthorpe Academy has made best use of Condition Improvement Funding (CIF) to optimise the health and safety of an estate that combines aesthetic heritage spanning back 450... > Read more

22/04/2021

Radford Primary School

CONTRACTOR: Cambridge Flat Roofing Premier Roofing Construction CONSULTANT: Barker Associates SYSTEM USED: TA-30 Flat Roofing System Langley Structures Striptiles Water leaking into the classrooms alerted the management team at Radford Primary Academy to the need to... > Read more