The main hall roof of this Roman Catholic girls’ school needed urgent attention and Langley’s comprehensive roof condition survey revealed that water ingress was being caused by wind-driven rain, and also that the roof had minimal insulation.

Part of the Diocese of Brentwood, the school was built in 1862, and pupils had been using the flat roof as an elevated playground area. The Langley technical team designed a system to waterproof the roof, conserving the historic fabric of the building, whilst upgrading it to a state of the art, 4G artificial grass football pitch.

Premier Roofing & Construction, a Langley Approved Contractor, skilfully installed Langley’s Graviflex anti-root layer, and additional insulation to improve the thermal efficiency of the building. They took care to create a robust surface for the football pitch with an additional rubber-based layer which also protects the insulation beneath.

Langley’s design ensured that the rainwater drainage from the new roof would be as effective as possible in order to protect the historic building.

In addition, Premier Roofing & Construction also fabricated and affixed a new bespoke safety cage, and replaced the external access stairs, all to a very high standard.

The school now has an innovative new playground area and the thermal performance of the hall has been upgraded to meet building regulations and reduced heating costs. They also have peace of mind knowing that the design, workmanship and materials of the new roof are covered by Langley’s 20 year independent insurance backed guarantee.

Main System Products:

Adepar JS VV

Graviflex Root Barrier Cap Sheet

Paradiene (35) S R4

Parafoam Ultra

Parevapo SBS

Download the full case study here

Further Information

Find out more about our roofing services by calling us on 01327 704778 or emailing us at [email protected]

Other Case Studies

28/02/2019

Clitheroe Golf Club

The proximity of pitched roofs and upstands were identified as potential fire risks by Langley’s comprehensive roof condition survey, requiring a flame free system. Langley’s survey highlighted that despite a multitude of ageing roof systems which had been... > Read more

22/02/2019

Debenham High School

Debenham High School became an Academy in 2011 and inherited buildings dating back to 1960s, including those with several leaking roofs. Langley worked alongside Debenham High School and Archer Building Consultancy to produce extensive condition reports and specifications to... > Read more