Case Studies

27/01/2012

Wandsworth Town Hall

Wandsworth Town Hall

Chartered Surveyors, Hughes Jay and Panter, turned to Langley and it’s high-performance bituminous SBS built-up roofing system for the refurbishment of this Grade II listed town hall which forms part of the Wandsworth conservation area for its architectural and historical importance.  

Not only was the unique shape and differing levels of the buildings' flat roof areas a challenge but numerous large glazed rooflights needed to be replaced or blocked over while ensuring that staff continued to work below with as little disruption as possible.

Langley entrusted approved contractors Breyer Group Plc to overlay the failing asphalt roof, install the newly designed structural rooflights and built-up roofing system.  The new system brings the roof in line with current U-value and modern building regulations ensuring its future for generations to come. 

 

Main System Products:

Parevapo SBS

Parafoam Ultra

Adepar JS

Paradiene (35) SR4

Parafor 30 GS

 

 

Download the full Case Study

Further Information

Find out more about our roofing services by calling us on 01327 704778 or emailing us at [email protected]

Other Case Studies

22/04/2021

Netherthorpe Academy

CONTRACTOR: Everlast Waterproofing CONSULTANT: Eddisons SYSTEM USED: TA-25 Flat Roofing System Netherthorpe Academy has made best use of Condition Improvement Funding (CIF) to optimise the health and safety of an estate that combines aesthetic heritage spanning back 450... > Read more

22/04/2021

Radford Primary School

CONTRACTOR: Cambridge Flat Roofing Premier Roofing Construction CONSULTANT: Barker Associates SYSTEM USED: TA-30 Flat Roofing System Langley Structures Striptiles Water leaking into the classrooms alerted the management team at Radford Primary Academy to the need to... > Read more