27/06/2017

Whitehouse Primary School

Collaborating with Wilmott Dixon’s design team, Langley assisted in specifying a robust long term waterproofing roof solution for this new educational building.

A major consideration was to ensure that the school roof could adequately withstand additional weight and foot traffic as a result of a PV system. The entire roof design incorporated contrasting demarcated walkways

offering prominent safety guidance for a lanyard fall system.

Ice Roofing and Cladding Limited, a Langley  Approved Contractor, was selected to undertake the installation which has ensured this new school roof area has a BBA certified 40-year durability statement with a 25 year insurance backed guarantee.

 

Main System Products:

Parevapo SBS

Adepar JS

Parafoam Ultra Tapered Scheme

Paradiene [35] S R4

Parafor 30 GS

 

Download the full Case Study

Further Information

Find out more about our roofing services by calling us on 01327 704778 or emailing us at [email protected]

Other Case Studies

16/01/2019

Carpenter Court

The roof and walkways of this residential building required urgent attention so the client turned to Langley for a reliable and thorough response within the tight timescale. The resulting specification was expertly installed by GWS Roofing & Loft Specialist Ltd, a Langley... > Read more

16/01/2019

Sporle Primary Academy

Langley was delighted to assist the Diocese of Norwich Education and Academies Trust by resolving the longstanding issues causing leaks through the roof at Sporle Primary Academy. A comprehensive roof condition survey by Langley revealed that the weak chipboard deck had... > Read more