Case Studies

At Langley, we have already earned an enviable reputation for the exceptional standards of our roofing solutions and services. Our goal has always been to work in partnership with our contractors and deliver a high-quality, personalised service, based on our extensive range of high-performance system solutions and accessories.

Take a look at some of the great solutions we have been working on below. For further information on any of the case studies shown, please get in touch and our team will be able to help.

09/08/2018

Belhus Leisure Centre

The swimming pool roof of this leisure centre had been repaired several times, and suffered from intermittent leaks. In addition, the refurbishment of the pool area below required the installation of new air conditioning units, however the existing roof did not have the structural strength to bear their weight. Langley designed and specified a new, high strength metal deck as the base for a comprehensive waterproofing system, to support multiple plant installations and provide a durable roofing solution. Arc Group London...

09/08/2018

Linton Mead Primary School

Langley was commissioned to carry out a roof condition survey for a school which had suffered leaks to its three roofs for over 20 years. The resulting specification included innovative design to resolve a range of problems that the survey had identified. Langley’s design and specification made the roof accessible for maintenance purposes where previously some areas could not be reached at all. The design improved the drainage by raising the height of three box gutters. It also involved the diversion of internal rainwater...

30/07/2018

Tamar Way

Langley’s comprehensive survey provided confidence that the roofs of these four London housing blocks could be overlaid. Despite their poor condition and an accumulation of moss and gravel, the insulation layer was shown to be dry. An overlay was specified in preference to stripping back the roof to the deck as there is less waste created, which is a significant environmental benefit. It also enables the client to increase the insulation and extend the life of the roof with a renewed waterproofing system, for less...

19/06/2018

Alec Hunter Academy

Langley worked on this planned asset management roof refurbishment project, carried out in three phases, to update and give this academy a new lease of life. A comprehensive roof condition survey identified that some roofs could be overlaid, while others had some structural issues, including two decaying Trofdeck roofs which required completely stripping back and rebuilding from joists up. Refurbishment work was carried out in phases as part of a five year asset management plan for the academy, keeping disruption to a minimum and...