Case Studies

At Langley, we have already earned an enviable reputation for the exceptional standards of our roofing solutions and services. Our goal has always been to work in partnership with our contractors and deliver a high-quality, personalised service, based on our extensive range of high-performance system solutions and accessories.

Take a look at some of the great solutions we have been working on below. For further information on any of the case studies shown, please get in touch and our team will be able to help.

27/06/2017

Whitehall Riverside Hotel (Premier Inn, Leeds)

Langley was selected to specify a roofing solution for this new inner city hotel and worked closely with the client’s architect when specifying, from inception through to completion. Suitable roofing solutions were required across varying roof areas of the hotel, including provision for a living green roof and a solution that could withstand the additional weight and foot traffic from a PV system. Three roofing systems were specified comprising Reinforced Bituminous Membrane Roofing, Hot-Melt Roofing and Green...

08/12/2016

Kingsbury High School

When London’s largest high school approached specialist consultants Capita PCC to refurbish its facilities, Langley was called upon for the roof refurbishment element. Langley’s in-depth survey and report highlighted complications with the schools current drainage system and inefficient insulation. The roof’s unusual design meant that every roof had to be individually designed due to the variation between the roofs and drainage issues each roof presented. The resulting Langley specification overcame these...

31/05/2013

Sir Stirling Moss

Sir Stirling Moss Langley has undertaken an impressive Copper Veral roofing project at the Mayfair home of British racing icon Sir Stirling Moss. The specialist copper veral solution from Langley was selected by Sir Stirling and the project’s contractor, Keith Marzetti of Tower Asphalt Ltd., for its long product life and high resistance to cracking. Sir Stirling knew he could trust the product, as the roof being replaced was a Langley Copper Veral system installed more than 20 years ago by Keith and his...

26/04/2013

Cedars Upper School

Cedars Upper School When Cedars Upper School in Leighton Buzzard required a roofing solution designed and installed within strict budgets, they turned to Langley, who provide a system lifespan guarantee of at least 30 years to help reduce total life costs and provide peace of mind. Working with the school’s chosen consultant  Wilby and Burnett, Langley’s team began by undertaking a comprehensive survey of the school’s existing roofing system. This detailed and bespoke report, including accompanying...